Operational Optinex related user stories and bug fixes:
Feature 6432: Budget Orders - Budget orders (not 100% fixed demands) can be sent to Optinex and can be shown in the AoT view besides the current Stock and PO values
Feature 6521: Kiln drying PO and Batch: It is possible to automatically create POs for the activity that comes after the one you are planning to create. For some activities batch sizes are introduced (e.g. drying) as fixed batch sizes have to be considered in this processes.
User Story 6335: Stock Reconciliation - Nightly job comparing stock in Optinex with stock in customer ERP-system
User Story 6213: Special shifts - Possibility to set start and end dates for shifts (special shifts / shift deviations)
User Story 6214: Display temporary shifts - Seeing temporary shifts in Timeline and Calendar view with its start and end date
User Story 6500: German Translations - German translations for all the functionalities in Optinex checked / added
User Story 4859: E-Mail Notifications - Notify users via E-Mail in async scenario error
User Story 6213: Shift validation - Validation while assigning shift to machine group for eventual overlapping of shifts
User Story 5804: Machine selection - Different approach of selecting machines in Prod Order view
User Story 6164: Stock Limits - Single stock limits are allowed in Optinex, e.g. no min value but max value
User Story 6183: PO Status - In calendar and timeline view, the status of the PO is displayed for every PO
Bug 6378: Searching for packages in Prod Order Report
Bug 5383: Loading data when searching for packages in Prod Order Report
Bug 6583: Bulk Edit Validation - With bulk edit – delete – Optinex is validating whether a PO can be deleted or not
Bug 6178: Calculation of Duration - Changing the quantity when creating a PO, once clicking out of the quantity field, the time needed for the activity is recalculated
Bug 6552: Demand Selection - When clicking on a row and not exactly on the check box at the beginning of each row, the row is selected correctly
Bug 6621: State Update from PO Grid - State change events for POs are logged also for changes done from the PO grid
Bug 6936: Delete Prod Order Lines - Possibility to delete Prod Order Lines from a PO in Optinex
Bug 6172: Order Recalculation: When creating a PO and selecting a product / by-product other than the one selected at the beginning and changing the quantity, the recalculation is done based on the product / by-product selected
Bug 6505: Activity Sorting - When creating a PO, the activities are sorted in ascending order based on their description
Bug 5659: Number as per local settings - Textboxes must display number as per local (decimal separators / thousands separator)
Bug 6337: Quantity for Optimizer - Correct quantity (transport package allocation) is now sent to the Optimizer when optimizing demands for Gluelam production
Bug 6389: PO Placing: Creating a PO it is placed at the first available time on the selected day or at the beginning of the shift if there is no time available this day
Bug 6753: Machine Selection - If the machine selection in calendar or timeline view is changed it stays like that when changing to another week. To change the machines, a new multiselect dropdown is shown
Bug 6754: Available Machine-Time - In calendar or timeline view the available time is displayed for all the selected machines
Bug 6955: Clean-Up Scheduling - To clean-up the current schedule (in calendar or timeline view), start and end date has to be selected. POs within this time range are rescheduled, POs that start outside this range are not considered in the clean-up (start and end date can be the same if clean-up is needed for just this day)
SFC related user stories and bug fixes:
User Story 6594: Instruction Text Box - Instruction text added to the PO in Optinex is shown in Prod Order Report
User Story 6597: Report Warning - If reporting on a line other than main, a warning is displayed to the user saying that the main line can’t be empty (reporting on main line mandatory)
User Story 6595: Instruction Files - Instruction files attached to a PO are shown in Prod Order Report
User Story 6846: Multi Language Support - Switching between English and German language is possible
User Story 6596: Sorting Rows - Prod Order Rows are sorted descending based on the volume in Prod Order Report