Release 1.9

  • Block multiple users editing the same plan (4794)

  • New number for generated/planned totals (1634)

  • Make it possible to set test piece length (4028)

  • Keyboard shortcut for planning (4822)

  • Block closing of plan if not all beams are Done OK (Rejects) (4823)

  • Bug 5738: Strange enddate on prodorder

  • User Story 4855: Last Prouction date of POs created; Make editable

  • User Story 5634: New ProdOrder scheduler adn calender

  • Bug 4861: ProdOrder Grid - Start & end date filter not working properly when PO streched to next day for both deviation & PO grid

  • Bug 5935: Wrong Main resorce is selected when creating from AoT

  • User Story 5825: PDF Instruction: Open PDF from "Edit Activity"

  • Bug 5826: PDF Instruction: Not possible to open files with % sign

  • User Story 6064: Sequencer: Add validation for when deleting PO connected to PO-Sequence

  • User Story 2706: Production Schedule - Filter on PO in Schedule view

  • User Story 4001: Open in Optinex in new tab with right click

  • User Story 5548: Scheduling: Toggle moving other orders on drag/and drop.

  • User Story 5635: Show deviation data on Production Timeline + Production calendar component

  • User Story 5930: Create demand lines from AOT

  • User Story 5172: Create PO: place new order in first free slot

  • Bug 5944: Create Production Order: Planned column is not loading

  • Bug 4991 - Linked Prod orders are not updated when used for changing PO

  • Bug 5889 – PDF not saving

  • Bug 6085 - UI - Production Calendar - Refresh button alignment is not proper with machine group dropdown

  • User Story 5553: Warning for Late Production; Dont show if LPD = PO EndTime